Examples of using Project performance in English and their translations into Bulgarian
{-}
-
Official
-
Colloquial
-
Medicine
-
Ecclesiastic
-
Ecclesiastic
-
Computer
reporting of indicators that limit the ability to use the reported data to conclude on project performance.
the relationship between price and project performance is the ultimate criterion,
however, investors need a level of certainty with respect to their probability of repayment and the reliability of project performance, embedded in a more cost effective system of project origination and underwriting.
the monitoring of actual project performance and results based on clear objectives
Transgeo Ltd. keeps faith with its politics for support of the young people development participating in a project performance on a national program"Modernization of the system for vocational education".
Asta Powerproject is a comprehensive product suite with the flexibility to meet the varying needs of everyone involved in running projects and those who rely on project performance.
Roma-specific indicators to monitor project performance not systematically required 98 Our analysis showed that there was also some confusion about the way to set out indicators for monitoring the project performance.
poses the risk of inadequately assessing project performance in relation to the overall goals of calls and work programmes.
Project performance is good if facility is in operation,
Project performance is good if most cost-effective projects selected:- best cost/energy capacity installed ratio(EUR/MW)- best cost/energy generation ratio(EUR/MWh);
reporting of indicators that limit the ability to use the reported data to conclude on project performance. o The ERDF cannot fund the preservation of endangered sites unless the work has an immediate economic
Project performance is good if there was solid ownership with adequate knowledge
All completed audited projects were operational at the time of the audit, but project performance often cannot be assessed 62 All the eleven completed projects we visited were operational at time of the audit,
are treated equally and the relationship between price and project performance is the ultimate criterion, so that they go to the best tender overall
not always‘best practice' criteria contributing to successful Roma inclusion were applied and monitoring project performance was difficult 132 Most ERDF
targets at all with which to measure project performance.
targets that had been specified to measure the project performance.
but‘best practice' criteria contributing to successful Roma inclusion were not always applied and monitoring project performance was difficult 95 During this audit we also visited 19 projects for Roma integration,
Increase Project performance and value.
This affected project performance in several countries29.