Examples of using Project performance in English and their translations into Hungarian
{-}
-
Colloquial
-
Official
-
Medicine
-
Ecclesiastic
-
Financial
-
Programming
-
Official/political
-
Computer
In some cases, monitoring systems did not record project performance in a reliable manner 48 In the case of all but one of the manag- ing authorities examined, performance information was provided by SMEs in the form of a standardised report.
Project performance is good if open call
criterion when selecting projects. o Project performance could be assessed only for some of the completed audited projects. .
Project performance is good if energy generated is>
to justify their contribution, poses the risk of inadequately assessing project performance in relation to the overall goals of calls and work programmes.
Roma-specific indicators to monitor project performance not systematically required 98 Our analysis showed that there was also some confusion about the way to set out indicators for monitoring the project performance.
were no indicators or targets at all with which to measure project performance.
The monitoring systems of the visited Member States allow project performance to be checked on an ad-hoc basis during the five-year durability period required by EU law,
reached(or exceeded) all targets. targets that had been specified to measure the project performance.
The achievement of OP objectives does not directly depend on individual project performance 67 We already concluded in a previous report that 2014-2020 ERDF result indicators are not specifically related to the interventions funded by the programme42.
but‘best practice' criteria contributing to successful Roma inclusion were not always applied and monitoring project performance was difficult 95 During this audit we also visited 19 projects for Roma integration,
All completed audited projects were operational at the time of the audit, but project performance often cannot be assessed 62 All the eleven completed projects we visited were operational at time of the audit, and the management teams of the sites were committed and dedicated to its preservation and promotion.
Project performance is good if most cost-effective projects selected:- best cost/energy capacity installed ratio(EUR/MW)- best cost/energy generation ratio(EUR/MWh);
not always‘best practice' criteria contributing to successful Roma inclusion were applied and monitoring project performance was difficult 132 Most ERDF and ESF projects examined during our audit had achieved their gen- eral objectives,
Figure 3- Project performance: number of completed projects achieving targets set for result indicators At project completion In 2018 Projects that reached all targets Projects with no result indicators 6 Projects for which no conclusion can be made(some targets reached,
Past projects performances.
EN 4.10.2018 Official Journal of the European Union C 357/235 THE COURT'S OBSERVATIONS PART 2- ASSESSMENT OF PROJECT PERFORMANCE 6.79.
Part 2- Assessment of project performance 6.81.
Measurement of project performance using appropriate systems,
Recommendation 4- Improve monitoring of project performance The Commission accepts this recommendation.