Examples of using Preselection in English and their translations into Chinese
{-}
-
Political
-
Ecclesiastic
-
Programming
Modification of preselection and evaluation criteria.
Preselection and domestic preferences 49-50 22 5.
The feature brings smart preselection, filtering, and XAML support.
Pass a Spring preselection based on academic and scientific qualifications.
For preselection, English-speaking films do not need to be subtitled.
Invitations to tender are sometimes issued directly without prior preselection proceedings.
He believed" preselection" was a more suitable term for section F.
A particle is first prepared in some initial state, a process called preselection.
Therefore, open tendering without a preselection phase is usually not advisable for the award of infrastructure projects.
Where preselection proceedings have been used, the criteria shall be the same as those used in the preselection proceedings.
Accordingly article 33 should contain a provision how the preselection should take place(especially ensuring transparency and non-discrimination).
Upon completion of the preselection proceedings, the contracting authority should invite the preselected bidders to submit final proposals.
Thus, they do not show the same level of automaticity that characterizes the preselection proceedings usually applied for the procurement of goods or services.
(5) Notice of any extension of the deadline shall be given promptly to each supplier or contractor to which the procuring entity provided the pre-qualification, preselection or solicitation documents.
The spring preselection for non-EU applicants is open until 31st March of 2016.
Preselection of bidders(see paras. 39-56).
It was a preselection of people with certain qualities.
Where preselection is required, it is sometimes limited to verifying a number of formal requirements(e.g. the bidders' professional qualification or legal capacity).
Quantitative preselection criteria are found to be more easily applicable and transparent than qualitative criteria involving the use of merit points.
Upon completion of the preselection phase, the contracting authority usually elaborates a short list of the preselected bidders which will be subsequently invited to submit proposals.