Examples of using Material consumption in English and their translations into Croatian
{-}
-
Colloquial
-
Ecclesiastic
-
Computer
Useful advice is to comply with the formula for mixing components declared by the manufacturer of epoxy self-leveling floors and material consumption.
From the method of layout depends not only the aesthetic appearance of the finished finish, but also the material consumption.
suitable fabrics and material consumption.
which means that the material consumption will also decrease.
quantity usually be decided based on customer's storage cycle or material consumption cycle.
Really, the material consumption can be somewhat lower- in fact, the calculation did
Corner layout in most cases does not require any material consumption, so specify in the online calculator bricks should only sum of the length and width of the structure.
which are distinguished by their high price and high material consumption.
the arts have replaced the drive for material consumption.”.
It should be noted that when using panels with patterns, the material consumption will increase somewhat,
its implementation is associated with too much material consumption.
Prior to the Boeing 777 aircraft composite material consumption was only about 10%,
coming from wind and weather-with minimum material consumption.
but also on material consumption: the higher it is,
there are some limitations such as long processing time and large material consumption.
Domestic material consumption(DMC) is an aggregate of materials(excluding water
By combining the segmented cutting tool with the other technology mentioned above, it is possible to further optimise material consumption, and the necessary investment is very quickly amortised by the significant material savings.
control in process production The purpose of surveillance is to review the current status on the basis of the produced quantities, during the production cycle, production material consumption and quantities of defective products.
reduced has material consumption, improve has construction efficiency,
The operator shall determine process emissions per source stream by multiplying the activity data related to the material consumption, throughput or production output,