Examples of using Steam generator in English and their translations into Czech
{-}
-
Colloquial
-
Official
Allow the steam generator to cool and wipe over with a damp cloth
1800 W Water Capacity' 1000 ml Steam Generator: Stainless Steel* Illustrations may differ from actual product.
Note: Water starts to flow out of the steam generator as soon as you turn the EASY DE-CALC knob to remove it.
The auto-off function/ECO mode is activated automatically when the steam generator has not been used for more than 10 minutes.
Before emptying your steam generator, it must always be left to cool for 2 hours to avoid any risks of scalding.
Tip: You can also take the steam generator to a sink and place it
remove the water reservoir from the steam generator.
If you tilt the steam generator during transport or place it on an uneven surface when the water tank is full,
The auto-off function/ECO mode is activated automatically when the steam generator has not been used for more than 10 minutes.
Besides that, a second defense step to protect the steam generator from scale is integrated: the steam function
You may have an ironing board that is not designed to cope with the high steam rate of the steam generator.
To avoid the risk of electric shock, do not disassemble the iron or steam generator, but telephone Morphy Richards for advice.
it is normal to hear boiling noises since the steam generator boils water to produce steam. .
other forms of corrosion attack boiler and steam generator tubes, turbines and other key components in the steam-water cycle.
The steam generator is tested for type examination
This appliance is for use as a steam generator and as a wet and dry vacuum cleaner, in accordance with the descriptions
Problem Possible cause Solution Too much scale and minerals have accumulated inside the steam generator.
Evaporation is created through a steam generator in which medicinal herbs and an ayurvedic natural herbal blend is placed.
Besides that, a second defence step to protect the steam generator from scale is integrated:
The project related to reconstruction of the total number of 5 HRSG(Heat recovery steam generator) in the aluminium plant Dubal in Dubai, with one boiler capacity of 240 MT of medium-pressure steam per hour.