Examples of using Diamond drilling program in English and their translations into French
{-}
-
Colloquial
-
Official
Diamond drill programs will be carried out on the Wabamisk
On the Coulon project(James Bay area), a diamond drill program started during winter 2016
Everton" have commenced 2 diamond drilling programs totalling 5,250 m on the Eleonore South and Opinaca A gold
The first 2,500 metres of a 5,000-metre diamond drilling program will begin in mid-September to test high-priority targets.
A first diamond drilling program of eight NQ caliber holes totalizing 938 metres happened at the end of 2012.
TSX. V: GMA announces the start of a 3,000 meters diamond drilling program(the" initial campaign") on its Anik gold project.
The initial exploration phases of the project typically start at the surface with a systematic diamond drilling program to establish the presence, density
focusing mainly on a diamond drilling program on Lens 257
to prepare targets for the upcoming diamond drilling program.
Azimut" or the"Company"(TSXV: AZM) is pleased to announce the results of the first eighteen(18) holes(4,443 m) of the 8,000-metre 2017-2018 diamond drilling program on the Eleonore South JV Property.
a major diamond drilling program of approximately 15,000 metres
Azimut" or the"Company"(TSXV: AZM) is pleased to announce that all results of the first phase of the diamond drilling program conducted this fall on the Eleonore South JV Property have been received,
a major diamond drilling program of approximately 15,000 metres
year 2015-2016(and not the 2015-2016 Sirios' fiscal year) a major diamond drilling program of approximately 15,000 metres.
will start a 5-hole diamond drilling program totalling 1,200 metres on the Opinaca A property,
holes of a 12-hole(2,510-metre) diamond drilling program completed this fall on the Eleonore South JV Property see appended figures and table.
On the Coulon project, a diamond drill program was conducted from January through spring 2016.
it is necessary to excavate an underground exploration ramp to be able to complete the diamond drilling exploration program according to the standards established in the industry.
The 2010 diamond drilling program is now finished.
A diamond drilling program started in March 2015 on La Grande Sud project James Bay area.