Examples of using Backfill in English and their translations into Greek
{-}
-
Colloquial
-
Official
-
Medicine
-
Ecclesiastic
-
Financial
-
Official/political
-
Computer
Pressure perfussion for foundation piles, backfill in overbroken tunnels,
Depending on the ground conditions, the thickness of the backfill layer is assumed to be 0.2- 0.6 m.
gravel in the same bed with a mandatory compacted backfill each ball.
so as not to damage the prepared layer of dry backfill.
construction of protective drainage backfill.
filtration fields with sand and gravel backfill.
Even if construction is under way on the heaving soils it is sufficient to calculate the width of the trench properly and provide backfill of nepuchinistogo grunta.
leveling backfill using a long level
indicating the height of the backfill.
Its full length contains relatively uniform backfill, with little erosion material in its deeper section,
Permeability ensuring drainage of backfill and no hydrostatic pressures behind the wall. Friendly to the environment.
It contains dark brown backfill with few traces of burning
a granite backfill is used, which allows particles to be trapped from 5 μm to 1 μm.
There are also pits that are sealed with a different backfill after each use or after some uses.
The backfill that seals them seems to have been used intentionally,
suitable for groove backfill;?
is suitable for trench backfill.
second overflow is already in place concrete bottom is sand and crushed rock backfill, through which the clarified water seep into the ground.
consolidation grouting and backfill filling grouting engineering;?
The absence of burnt residue, therefore also of radiometric dating, from the backfill of the sections outside the pits