Examples of using Initial operational in English and their translations into Indonesian
{-}
-
Colloquial
-
Ecclesiastic
-
Computer
-
Ecclesiastic
manufacturing development(EMD) and initial operational test and evaluation(IOT&E)
He said he hoped to certify an“initial operational capability” or IOC of F-35 jets at the early end or“leading edge” of an August-to-December time frame set by the Air Force several years ago.
The JPO now plans to resolve all of the F-35's critical deficiencies prior to entering initial operational test and evaluation, which was anticipated for fall 2018, according the GAO.
says the program has not met the necessary entry criteria to begin the crucial combat-testing phase called Initial Operational Test and Evaluation(IOT&E).
better known as the Joint Strike Fighter, has begun its initial operational test and evaluation(IOT&E) phase, which will test whether the plane is reliable enough for full production.
The F-35 Enterprise achieved numerous critical milestones during 2018 which have set a solid foundation for the program to complete Initial Operational Test and Evaluation and move into full
is a first glimpse of what the future air wing will look like once the F-35C reaches initial operational capability and is more widely fielded.
the Indian Air Force, all the contracted 20 Tejas fighter jets of an initial operational clearance standard were supposed to be delivered by 2011,
placed an initial order for 40 Tejas LCA Mark-I with HAL, of which 20 Tejas LCA in initial operational configuration- 16 fighters
with the first aircraft of this batch being used for initial operational test and evaluation(IOT&E),
the MBDA Brimstone anti-armour missile, which entered service with initial operational capability(IOC) on the RAF Tornado GR.
Following his initial operational assignment in fighter aircraft,
His initial operational assignment was in fighter aircraft,
The initial operational requirements for the KF-X/IF-X program as stated by South Korea's Agency for Defence Development were to develop a single-seat, twin-engine jet with
Initial Operational Capability.
Initial Operational Capability is planned for 2024.
Both AESA radars have met initial operational capability.
Initial operational capability(IOC) is planned for 2025.
Block 1: Initial operational capability and basic air defence capability.
Such planes will likely reach initial operational capability by about 2025.