Examples of using Work cycle in English and their translations into Italian
{-}
-
Colloquial
-
Official
-
Medicine
-
Financial
-
Ecclesiastic
-
Ecclesiastic
-
Computer
-
Programming
-
Official/political
But even the movement time of the robots is used for additional tasks during the work cycle.
In conventional systems, the operator manually loads the cardboard blanks into the magazine both at the beginning of the work cycle and each time the magazine empties;
photoelectric cells for operator safety throughout the work cycle.
emitting ultrasonic high work cycle in the form of average duration pulses at a constant frequency.
sitting operator that manually supplies the parts to be riveted and starts the work cycle by a foot pedal.
quality of the welding seam in one work cycle.
automatic hammer changing systems, work cycle programming, interfacing with rail-bound manipulators,
The control panel for work cycle programming features a simple and intuitive user interface.
SW updates offer a new“Easy-User” interface, a mode that simplifies man-machine interaction and makes work cycle programming more immediate.
The DUOPROB 60-UP operates very rapidly- one work cycle takes about 20- 25 sec.
The operators have changed from a thirty-minute to a forty-minute work cycle.
The work cycle can be manual
Coke car conductor. duration of work cycle: 174 sec.. length of heat exposure in each cycle:
The work cycle can be manual
Work cycle is managed by a PLC that is capable of controlling all machine functions and synchronisms.
The work cycle is managed by intuitive software which guides the operator through simple instructions on the touch screen display.
Advantage of choosing compensation radius and short work cycle make it ideal for special work and high production of piece balancing.
system for the on-line monitoring the machinery during the work cycle.
The machine is provided with 4 numerically controlled axes thanks to which the work cycle is automatic.
Where materials and the corresponding production orders are sorted identifying the different layout based on the work cycle chosen.