Examples of using Total eligible in English and their translations into Romanian
{-}
-
Colloquial
-
Official
-
Medicine
-
Ecclesiastic
-
Ecclesiastic
-
Computer
-
Programming
The co-financing shall be of at least 10% of the total eligible costs of the project.
without being allowed to exceed the total eligible cost, in the following cases.
A project-specific lump sum would be established on the basis of the estimated total eligible costs.
The checks carried out for the period 2000-2006 shall cover at least 15% of the total eligible expenditure incurred on projects first approved during that period.
The minimum intensity of public aid shall be 20% of the total eligible expenditure of the operation.
The co-financing shall amount to at least 10% of the total eligible costs of the Action.
direct management method and the Fund's contribution may amount to 90% of the total eligible costs of an action.
The EU contribution(grant) for a project shall be of maximum 90% of the total eligible costs of the project;
Member States shall apply a maximum intensity of public aid of 50% of the total eligible expenditure of the operation.
The average Community contribution to these actions(maximum of 80% of the total eligible costs) is estimated at 350 000 euros.
related logistics may cover a maximum of 100% of the total eligible cost when one of the following criteria is met.
To these the EBF contributed up to 90% of the total eligible costs of each project.
The Programme may reimburse up to 100% of total eligible costs of an action, except for.
related logistics shall not exceed 85% of the total eligible cost.
The EIT contribution may cover, up to 100% of total eligible costs of KIC added value activities".
The co-financing of the EU is maximum 90% of the total eligible costs at project level.
The contribution from the Funds shall be calculated in relation to either the total eligible cost, or the total public
(b) a maximum of 50% of the total eligible cost and, as a general rule, at least 25%
can vary from 10% up to 80% of the total eligible project value, depending on the type of state aid granted,
(i) 40% of the total eligible cost in the regions covered by Objective 1,