Examples of using Unit must in English and their translations into Spanish
{-}
-
Colloquial
-
Official
The Rio IPL unit must be unlocked using a key.
During operation, the unit must be placed on a dry and level surface.
Prior to calibration, the unit must be placed in calibration mode.
The unit must only be transported in its vertical position;
The unit must be sized between 10- 30 cubic feet.
Unit must be returned to an authorized service facility for service.
The Hello Skin unit must be unlocked using a key.
Unit must be properly grounded in accordance with local wiring code.
Everything in unit must be removed from site premises.
Unit must have at least 4 gallons per minute of water supply.
Unit must be installed on an angle for proper.
Unit must be in the Off Position
Unit must be installed in a level location.
This unit must be used with the guidance of a Physiotherapist.
The unit must be installed according to all local codes.
The unit must be securely placed on a horizontal and flat surface.
The unit must be handled with care,
The unit must be correctly installed according to the instructions.
Unit must be properly grounded in accordance with local wiring code.
Unit must be installed on an angle for proper condensation run-off.