Voorbeelden van het gebruik van Freight corridor in het Engels en hun vertalingen in het Nederlands
{-}
-
Colloquial
-
Official
-
Ecclesiastic
-
Medicine
-
Financial
-
Computer
-
Ecclesiastic
-
Official/political
-
Programming
Any person working on these freight corridors should not be put in a position where the free movement of goods clashes with the exercise of their fundamental rights.
Several delegations stressed the importance of developing international freight corridors with a view to improving the competitiveness of the railways.
He said that"specially developed freight corridors" for longer distances should also include rail transport.
objectives such as rail freight corridors, green corridors
B2 could therefore be a first step before, in the longer term, dedicated freight corridors are developed.
upgrading of common freight corridors.
Belonging to the TEN-T Network should not be an exclusive criterion for the choice of freight corridors.
Hh Public presentation on"European freight corridors" to support the follow-up to the TEN/381 opinion(rapporteur:
they should include all the relevant infrastructure components e.g. in the case of rail freight corridors: bottlenecks to be removed,
either in the form of dedicated freight corridors or by setting‘smart' priority rules.
the proposal for a Directive on Rail Freight Corridors and the Single European Sky policy.
The Communication also underlines the importance of cooperation between Core Network Corridors and the nine Rail Freight Corridors created under Regulation(EC) 913/2010 and which should be represented in the Core Network Corridor Forum.
the need to coordinate with other initiatives, such as the Rail Freight Corridors, the NAIADES II,
effective regulatory oversight may be required as the implementation of rail freight corridors and development of the single European Railway area progress further.
a cross-border dimension and requiring stronger cooperation between regulatory bodies is expected as a result of the establishment of rail freight corridors, which became operational at the end of 2013 with allocation of international pre-arranged paths being performed by the corridor one-stop shops for the first time in 2014, and further development of the single European railway area.
axle load authorised for the trains running in the freight corridor.
The freight corridor shall allow international and national rail freight
Applicants for the use of the freight corridor shall be consulted by the governance body before the implementation plan is approved and when it is updated.
it is appropriate to set up a one-stop shop for each freight corridor.
In order to stimulate coordination between the Member States and the infrastructure managers, each freight corridor should be supported by a governance body comprised of the various infrastructure managers who are involved with the freight corridor.