Примеры использования Power transformers на Английском языке и их переводы на Русский язык
{-}
-
Official
-
Colloquial
you can detect issues in power transformers and bushings and decide on the proper type of maintenance before failures occur.
installed power transformers by Hyundai Heavy Industries
At the substation"Revival" there are two power transformers with a total capacity of 20 MVA(2x10MVA) installed.
Therefore, we have developed a wide range of solutions for testing power transformers that operate in line with international standards.
Power transformers and autotransformers 110-750 kV of a capacity more than 25 MVA, including the three-phase design;
At the feeding centre two power transformers of 25 MVA were mounted, each of them is equipped with automatic on-load tap changing.
Dependences of values of average risks on probability of occurrence of defects in power transformers of a class 110 кВ not hermetically execution were investigated.
electrical integrity of the active part of power transformers.
The power transformers of penitentiary institution No. 4 in Cricova and No. 5 in Cahul were also repaired.
Atthe supply centre there will betwo power transformers of25MVA each installed,
press frames, in power transformers.
The directive defines specific rules to be observed in the design of ecodesign distribution and power transformers.
(4) For electrical equipment with large electrical capacity such as power transformers, when using the AC bridge for tan δ test, the capacity rise effect should be considered.
The MPD 600 measures partial discharge in compliance with the IEC 60270 standard to ensure the reliable detection of PD activity in power transformers.
Its use excludes sample collecting; fixing defects into the paper-oil insulation in power transformers and allows reducing environmental load significantly.
Power transformers, as indispensable and frequently used power equipment in power systems,
Ulrike Broniecki: PD measurement is a reliable and non-intrusive method that can be used anytime to diagnose the insulation condition of power transformers.
The entire measurement process should pay special attention to the fact that the power transformers A and a cannot be reversed, otherwise the high
mainly used to low-voltage short circuit impedance test in power transformers(single or three phase)
DTEK Donetskoblenergo is going to install additional power transformers this year to provide a backup power supply if needed.