Примеры использования Prequalification на Английском языке и их переводы на Русский язык
{-}
-
Official
-
Colloquial
The WHO prequalification programme mechanism should be promoted to ensure speedy registration(such as fast-track mechanisms)
It was noted that open tendering with prequalification or pre-selection might achieve the same purposes as restricted tendering in a more transparent manner.
For inclusion in the register of legal entities admitted to the conclusion of subcontracts, it is necessary to familiarize yourself with the"Provision on Prequalification of Contractors" and provide the documents listed therein.
The Prequalification Programmes were developed by WHO in 2001 to promote
The prequalification programmes follows a systematic process consisting of a detailed technical review of required documentation,
The WHO Prequalification of In Vitro Diagnostics Programme undertakes a comprehensive assessment of IVDs through a standardized procedure aimed at determining if the product meets WHO prequalification requirements.
Mr. WALLACE(United States of America) said that legislative recommendation 2 was related to the technical issue of prequalification policy.
A suggestion was made that the Guide should highlight that prequalification might be used for limiting access to a specific procurement.
It was noted that pre-selection was commonly used in large projects or where the prequalification was utilized for testing the market.
which was inconsistent with provisions on prequalification.
contractor qualified for competitive negotiations after the prequalification stage.
The capability of the tenderer to perform the contract is assessed through either prequalification or post-qualification process.
have WHO prequalification.
as request for proposals), preceded by a prequalification phase.
Therefore, open tendering without a prequalification phase is usually not advisable for the award of infrastructure projects.
it is generally advisable to exercise caution in respect of proposed substitutions of individual members of project consortia after the closing of the prequalification phase.
that all companies which met the prequalification criteria should be allowed to submit bids.
such as the business plans required for prequalification of companies and their capacity to perform on contracts for timber harvest
applicable equally to prequalification procedures) and the procedures found in paragraphs(2)
Prequalification will be conducted through prequalification procedures specified in the World Bank's Guidelines: