Примеры использования The brine на Английском языке и их переводы на Русский язык
{-}
-
Official
-
Colloquial
If the brine pump test run is activated as part of the 10‑day brine pump operation procedure, it is required to activate the test run as fast as possible.
Whilst with mercury electrolysis up to 2 ppm of calcium were permitted in the brine, 10 ppb at most are allowed with the membrane electrolysis- that‘s 200 times less!
In partial load conditions, a traditional on/off ground source heat pump sequently switches ON and OFF, whereby the brine temperature decreases down to -4 C when the unit is operating.
ON: The unit operates as normal, except that the brine pump operates continuously for 10 days, independent of compressor status.
thereby gradually changing salt concentration in the brine.
To allow for temperature measurement tolerances, the brine concentration MUST resist to a lower temperature than the defined setting.
because the time of the cheese block being in the brine also depends on that value.
Start the brine filling station MUST be started within a time frame of 5~60 seconds after starting the brine pump test run.
Air purge function on the brine circuit When installing and commissioning the unit, it is very important to remove all air from the brine circuit.
All pipe work connected to the brine pressure relief valve MUST have a continuous fall.
and draining the brine circuit.
concentration of the anti-freeze in the brine system, the freezing temperature will differ.
It is required that the brine circuit is filled BEFORE the brine pump test run is activated.
The brine pump test run starts running, starting the removal of air from the brine circuit.
which is preserved by the brine.
Start to cook the brine: add salt to the water,
Electric current in the cell decomposes the brine to chlorine gas at the anode
not affected by solid particles i.e. sand and stones in the brine.
in this case the brine content determines the material class/grade.
be prepared for the fact that the brine is turbid