For the biennium 2000- 2001, the resource requirements are estimated at the same level as was approved for 1998- 1999.
应大会请求,每年向大会提交所需资源估计数,并在实际支出之前取得核准。
At the request of the General Assembly, the estimated resource requirements have been presented to the Assembly on an annual basis and its approval sought prior to expenditures being incurred.
These estimated requirements represent an increase of $5,000 over the 2008 revised estimates and may increase in the event that UNIDIR organizes field missions.
委员会关于司法所需资源估计数的意见和建议载于下文第二章相关的预算款次内。
The Committee' s observations and recommendations on the estimated resource requirements relating to the administration of justice are contained in chapter II below, under the relevant budget sections.
秘书长建议在2014/15年度实施15个速效项目,所需资源估计数为500000美元。
The Secretary-General proposes 15 quick-impact projects for 2014/15, with estimated resource requirements in the amount of $500,000.
经询问,行预咨委会收到了下列2010/11年度所需资源估计数分类说明:.
Upon enquiry, the Committee received the following breakdown of the estimated requirements for 2010/11: Description.
依照这项指引,其后预算大纲都列入符合实际的特别政治任务所需资源估计数。
In accordance with that guidance, subsequent budget outlines had included realistic estimates of requirements for special political missions.
在这方面应回顾指出,1974年至1991年期间的所有中期计划都载有所需资源估计数。
In this connection, it is recalled that all medium-term plans, from 1974 to 1991, included estimates of resource requirements.
报告第60段内的表按工作地点和职能或项目开列所需资源估计数。
The table in paragraph 60 of the report contains a breakdown of the estimated resource requirements by duty station and function or project.
The estimated requirements for 2009 amount to $15,204,000, which includes, inter alia, the requirements for the establishment of 73 positions(ibid., paras. 83-87).
The estimated requirements for 2010 for special political missions grouped under this cluster amount to $10,646,200(net) and requirements by mission are detailed in the table below.
Estimated resource requirements for the Tribunal for the biennium 2012-2013 amounted to $280.2 million gross before recosting, reflecting a decrease of $40.4 million gross, or 12.6 per cent, compared with the revised appropriation for 2010-2011.
Table 1 provides a breakdown of projected expenditures as at 31 December 2007 and the estimated requirements for 2008 by mission and allows for a comparison between total requirements for 2008 and total requirements for 2007.
The estimated resource requirements in the amount of $2,952,500, reflecting an increase of $85,600, relate to the United Nations share in the budget of the Unit for the biennium 2010-2011, which is 23.5 per cent.
In addition, the estimated requirements reflect the application of a lower vacancy rate of 10 per cent for international staff positions, whereas a vacancy rate of 15 per cent was applied in the 2009/10 period.
The estimated resource requirements for this area are $237,000, representing 20 per cent of the total budget, including the salary of the Director of the Institute at the D-2 level, official travel, meetings and consultancies.
English
Bahasa indonesia
日本語
عربى
Български
বাংলা
Český
Dansk
Deutsch
Ελληνικά
Español
Suomi
Français
עִברִית
हिंदी
Hrvatski
Magyar
Italiano
Қазақ
한국어
മലയാളം
मराठी
Bahasa malay
Nederlands
Norsk
Polski
Português
Română
Русский
Slovenský
Slovenski
Српски
Svenska
தமிழ்
తెలుగు
ไทย
Tagalog
Turkce
Українська
اردو
Tiếng việt