Examples of using Were offset in part in English and their translations into Arabic
{-}
-
Colloquial
-
Political
-
Ecclesiastic
-
Ecclesiastic
-
Computer
The overall additional requirements were offset in part by reduced requirements for the rental and operation of the Mission fixed-wing aircraft fleet owing to lower cost of flight hours under the terms of a new contract effective October 2010.
However, the unspent balances were offset in part by additional requirements($1.0 million)
The overall decreased requirements were offset in part by higher requirements for self-sustainment owing to the retention of three battalions(2,348 contingent personnel) and two formed police
These savings were offset in part by additional requirements under air transportation for the replacement of three MI-8MT helicopters by three MI-8MTV helicopters at a higher rental cost, for operational and safety considerations, the MI-8MTV helicopter being considered more appropriate for desert conditions.
The additional requirements were offset in part by reduced requirements for standard reimbursements to troop-contributing governments for contingent-owned equipment under military personnel owing to delays in the planned deployment of some military units, the early repatriation of two units and the deployment of fewer items of equipment compared with the provisions of the memorandums of understanding.
However, the lower requirements were offset in part by the reliance of the Operation on air assets to move cargo and personnel throughout the area of operations, dictated by a combination of such external factors as the unstable and erratic security situation on the ground and lack of proper road infrastructure.
The savings were due to many factors, including the reduced provision for contingent-owned equipment and the reduction in the number of civilian police, and were offset in part by a number of increases, including higher costs for air operations and for the salaries of local staff, whose remuneration had increased by some 15 per cent following a salary survey for the area.
The overall lower requirements were offset in part by the lower than budgeted average vacancy rate of 4.4 per cent for national General Service staff compared with the budgeted 5 per cent and the implementation of revised salary scales with effect from 1 February 2007 for the categories of national staff.
The additional requirements were attributable mainly to increased requirements for reimbursements to troop- and formed police-contributing countries for self-sustainment, which were offset in part by reduced requirements for medical services owing to the non-implementation of FARDC training and the non-receipt of invoices from a military hospital in South Africa for medical evacuations.
The overall increased requirements were offset in part by lower requirements for polling and counting kits in support of the elections resulting from the joint decision by the Mission and the National Election Commission to purchase election materials separately in bulk and assemble the kits in-country rather than purchasing pre-packed kits. V. Actions to be taken by the General Assembly.
savings of $155,000 under civilian personnel costs in the case of local staff salaries, common staff costs and general temporary assistance, which were attributable to vacancies, were offset in part by additional requirements of $139,000 under international staff salaries.
The unencumbered balance was attributable primarily to reduced requirements under civilian personnel, premises/accommodation, transport and air operations, other equipment and air and surface freight, which were offset in part by additional requirements under communications, supplies and services and the absorption of the cost of the financing of the United Nations Logistics Base at Brindisi.
These were offset in part by increased requirements resulting from the increase in the average cost of fuel, exchange rate fluctuations related to the acquisition of prefabricated buildings and the settlement of outstanding freight charges, additional accommodation equipment for the expansion of the Interim Force headquarters, additional safety and security equipment and additional requirements for alteration and renovation services related to the rapid deployment of military contingents, for which no provision had been made;
The overall reduced requirements were offset in part by additional requirements with respect to civilian personnel costs due to the higher actual deployment of international staff and operational costs, which stemmed mainly from the implementation of the Mission ' s construction programme, supplies
The variance is offset in part by reduced requirements for construction services and maintenance supplies.
The unutilized balance was offset in part by additional requirements under Inspira.
The variance was offset in part by the recorded expenditure on losses on exchange.
This additional requirement was offset in part by an unutilized balance of $543 for the security service at Rosh Hanigra.
The increase was offset in part by lower requirements for information technology services($0.4 million)
The increase was offset in part by lower requirements in relation to the implementation of disarmament, demobilization and reintegration-related projects($9.0 million).