Examples of using Project documentation in English and their translations into Norwegian
{-}
-
Colloquial
-
Ecclesiastic
-
Ecclesiastic
-
Computer
it is necessary to analyze the project documentation, and above all, working drawings.
volume of the solution is calculated at the time of the creation of project documentation.
We can generate project documentation, assemble system,
easy issue tracking, project documentation(wiki), forums, chats.
The connection to the water supply system is located 150 m from the house and the preparation of the project documentation for the road where will be placed the water supply system is in process.
It also indicates the type of wire and cable in the project documentation, the method and circuit of the gasket,
If we believe the project documentation, the platform is designed"for modern phones
According to the project documentation, the completion of construction(boom)
In addition to these calculations in the project documentation prescribed type
materials taken into account in the subsequent part of the project documentation.
Via Mobile Files you have, for example, efficient access to customer contracts or important project documentation.
Therefore, when designing the project documentation, be careful
In drawing up the project documentation for any construction work not correctly indicate the brand of concrete,
For construction of the hotel, a building permit was obtained according to the project documentation, all contributions for water
The project manager then completes the remainder of the project documentation and submits the project to engineering for development.
to ensure the conformity of the work quality with the building standards, project documentation and the company's quality system.
thanks to the quality management system we can guarantee that the timber frame houses will be produced according to project documentation.
The connection to the water supply system is located 150 m from the house and the preparation of the project documentation for the road where will be placed the water supply system is in process.
The connection to the water supply system is located 150 m from the house and the preparation of the project documentation for the road where will be placed the water supply system is in process.
If the board size is registered in the project documentation is correct,