Examples of using Electricity generated in English and their translations into Russian
{-}
-
Official
-
Colloquial
You can also store electricity generated by small wind turbines
be shifted to electricity generated by renewable energy.
a tax exemption for electricity generated by waste incinerators the Netherlands.
own freight transportation services and electricity generated by a cascade hydropower station.
Theoretically speaking, almost every second bulb in the homes of residents of the Sverdlovsk region, are lit up by electricity generated by Reftinskaya GRES.
Legislation has been enacted in a way that"Barqi Tojik" agrees to buy electricity generated from small hydropower plant at a bargain price.
Having achieved the required height the rotor transfers to the generator mode, and the electricity generated is used to boost the second rotor in the opposite direction.
dams recently built or planned in Georgia, the electricity generated at the Shuakhevi HPP will mainly be exported.
Electricity generated for rapidly expanding cities
It is worth mentioning that feed-in tariff for electricity generated at plants, which have been commissioned during previous years,
where lignite is mined at a cost of US$ 23/tce, and electricity generated at 0.9 c/kWh against 1.5 c/kWh based on imported coal
Electricity generated from chicken manure
However, when the lamps are powered with electricity generated from coal, the potential mercury emissions from the lamps may be more than offset by the mercury emissions avoided by the reduced power generation.
persistent failures to pay by Energorynok state-owned company for electricity generated, non-market-based electricity rates
inhabitants in developing countries cannot be provided with electricity generated by, say, solar cells,
Electricity generated by wind farms will be sold on the Russian wholesale market,
was due to a significant fall in demand for electricity generated by the plant, and the concurrent decline in the generation,
Electricity generated by the hydropower plant is transmitted through the transmission line 38.7 km long to supply electricity to consumers of oil processing plant, cotton processing plant, a soap factory and other objects in Bayramali town.
There will be no demand for electricity generated by Gusev plant until 2020,
All electricity generated in Uganda must be sold to UETCL,