Examples of using Subpart in English and their translations into Slovak
{-}
-
Official
-
Colloquial
-
Medicine
-
Financial
-
Ecclesiastic
-
Official/political
-
Computer
-
Programming
a restricted type-certificate under the conditions laid down in this Subpart.
issued in accordance with this Subpart;
Each major change to that part of a product covered by a supplemental type-certificate shall be approved as a separate supplemental type-certificate in accordance with this Subpart.
(c) A person or group of persons shall be nominated with the responsibility of ensuring that the organisation is always in compliance with this Subpart.
In addition, OPS 1.1110, which also appeared in Annex III, subpart Q, of Regulation No 3922/91,
The current FTL rules are contained in Subpart Q of Annex III to Council Regulation(EEC)
This Subpart establishes requirements to be met by the operator related to flight crew training,
medical evaluation of Subpart Q and, where relevant, of Subpart O of Annex III.
after 1 June 2001- 40 C.F.R. Part 60, Subpart CCCC.
The Pilot-owner(or his contracted continuing airworthiness management organisation referred to in Subpart G, Section A of this Annex)
Subpart D- reformulated gasoline; Subpart H- gasoline sulphur standards; Subpart I- motor vehicle diesel fuel; non-road, locomotive, and marine diesel fuel; and ECA marine fuel; Subpart L- gasoline benzene; and.
rest periods as referred to in Annex III(Part-ORO), Subpart FTL to Regulation(EU) No 965/2012; and.
Reactor Processes- 40 C.F.R. Part 60, Subpart VV, Subpart III, Subpart NNN and Subpart RRR;
for each maintenance organisation approved in accordance with Subpart F of Section B of this Annex(Part-M)
the table referred to in point 13 provides the standard system for the approval of maintenance organisation under Subpart F of Annex I(Part-M)
Wastewater- 40 C.F.R. Part 63, Subpart G;
TRE qualified in accordance with Subpart K his/her ability to instruct a pilot to the level required for the issue of a type rating, including pre-flight, post-flight
This Subpart establishes the procedure for the approval of major changes to the type-certificate under supplemental type-certificate procedures, and establishes the rights
duty times as contained in Subpart Q of the EU-OPS Regulation cannot be changed until a study into fatigue has been commissioned and the wider industry consulted.
required for theoretical knowledge instruction for the relevant type rating, in accordance with Subpart H.