Examples of using The interim evaluation in English and their translations into Swedish
{-}
-
Official
-
Colloquial
-
Medicine
-
Ecclesiastic
-
Ecclesiastic
-
Official/political
-
Computer
-
Programming
-
Political
The interim evaluation confirms that the activities
The interim evaluation of the EFF concluded that the existing indicators are focused on output
In Leonardo da Vinci, the projects action has been reconceived in the light of the results of the interim evaluation.
The interim evaluation of EMODnet35 found the proposed fields for thematic groups logical,
The interim evaluation will be completed by end 2017 to feed into the preparation of a successor instrument to the Programme.
The interim evaluation of FP7 was carried out by a group of ten independent experts which looked at the design,
Although some of them have already been tackled recently, we expect that the interim evaluation will lead to significant overall improvements in the EIT.
This would be supported by a coherent set of independent studies, the interim evaluation and other evaluation activities carried out over the life-time of the Framework Programme, as listed above.
In the field of research, the Council adopted conclusions on the interim evaluation of the EU's Seventh framework programme for research activities(2007-2013),
consideration should be given to the possibility of lowering this barrier to 25% during the interim evaluation of the Eurostars programme4.
Consideration should be given to the possibility of lowering this barrier to 25% during the interim evaluation of the Eurostars programme.
Secondly, completing the interim evaluation, which ended during 1998
The interim evaluation also pointed to the need for better monitoring(with particular regard to the collection of data)
In most Member States, one of the aims of the interim evaluation, the production of practical recommendations for the second stage,
Moreover, the interim evaluation of the EFF shows that the main administrative burden was due to the setting up of the Management and Control System.
The interim evaluation of Leader, which will be presented at the end of this year,