Voorbeelden van het gebruik van Building elements in het Engels en hun vertalingen in het Nederlands
{-}
-
Colloquial
-
Official
-
Ecclesiastic
-
Medicine
-
Financial
-
Computer
-
Ecclesiastic
-
Official/political
-
Programming
lighting systems including their full integration into building elements walls, ceilings, windows.
they can be combined perfectly with other claddings and building elements.
Key to the architects' is the differentiation of architectural forms for individual building elements.
you can create building elements of various forms.
EMI-shielding by the integration of very thin electrically conductive FRP panels(based on carbon fibres) into building elements walls, ceilings and floors.
with the help of any complexity insulated building elements without any problems.
Print page Perimeter Perimeter insulation is the insulation of building elements in contact with the ground.
From legacy building elements and reused, structural arrangements
Drawing and dimensioning commands for building elements such as windows, stairs, doors….
Aligning of windows, partition walls and other building elements get done quick and easy.
EN 13501-3: fire classification of construction products and building elements- part 3:
dynamic building elements and architectural constructions are investigated.
while Member States set minimum requirements for the energy performance of installed retrofitted or replaced building elements under their national building codes.
technical solutions for building elements on the one hand
The provisions of this Directive should not prevent Member States from setting more ambitious energy performance requirements at building level and for building elements as long as such measures are compatible with Union law.
fixed mounting to other building elements such as walls,
that energy performance requirements are also set out for building elements.
ceilings including their surface coverings, building elements, products incorporated within building elements, pipes and duct components
It can be seen from the table that the value of the two incentives in combination is somewhat less than the sum of their separate values since tax on the building element of the IPR is paid more quickly when an accelerated depreciation allowance is taken up.
These two building elements are connected by the central hall.