英語 での Feasibility study の使用例とその 日本語 への翻訳
{-}
-
Colloquial
-
Ecclesiastic
-
Computer
-
Programming
In 2012, China Airlines partnered with Taiwan's Industrial Technology Research Institute to conduct a feasibility study on the use of electric vehicles at airports.
Adaptation and implementation of the ARK(Antibiotic Review Kit) Intervention to safely and substantially reduce antibiotic use in hospitals: A feasibility study.
The Swedish government has asked the Swedish space agency to create a feasibility study on the launch of SmallSats from the Esrange launch pad.
The 1st committee of the ATF feasibility study workshop(Aug.29,2014).
(★ 1)“Infrastructure development research project for Joint Credits acquisition”(quantifying international contribution and JCM feasibility study).
Space- Based Solar Power As an Opportunity for Strategic Security Phase 0 Architecture Feasibility Study 10 October 2007.
The 3rd committee of the ATF feasibility study workshop(Dec.08,2014).
Our proposal was adopted for the public offering of the METI Project“Feasibility study program”.【TEPCO IEC, Inc.】.
Our proposal was adopted for the public offering of the METI Project“Feasibility study program”.
OASIS special lecture/ The 5th committee of the ATF feasibility study workshop.
Feasibility study on EPC, fund raising for multiple micro-hydro power projects on Lombok Island Indonesia(2017FY).
The forecast market information, SWOT analysis, Ski HardGoods barriers, and feasibility study are the vital aspects analyzed in this report.
The forecast market information, SWOT analysis, Sports Analytics barriers, and feasibility study are the vital aspects analyzed in this report.
In 2009 Lee Myung-bak, South Korea's president at the time, ordered a feasibility study.
The feasibility study is expected to begin in 2018, and be completed by 2019.
The Feasibility Study has been prepared in accordance with the so-called Stadium Law, which promotes the development of sports infrastructure in Italy.
The Mount Ida feasibility study will be based on annual production of ten million tonnes of magnetite concentrate grading +68 per cent Fe.
The Gilgel Gibe deal was awarded without a feasibility study, and construction started without the legally required environmental permit.
As part of the assessment process, a feasibility study was carried out by Fergus and McIlveen of Belfast.
The Feasibility Study has been prepared in accordance with the so-called Stadium Law, which promotes the development of sporting infrastructure in Italy.