英語 での The new terminal の使用例とその 日本語 への翻訳
{-}
-
Colloquial
-
Ecclesiastic
-
Computer
-
Programming
Once the new Terminal 2 opens in 2014, the 23 Star Alliance member carriers operating at Heathrow will move in various stages from their current terminal locations.
As a result, although certain evaluation was obtained for maintenance and promotion of health, the following issues were also clarified, and a solution was made at the new terminal.
Delivery is expected by the spring of the 2018, so that the new terminal is able to effectively support and in the shortest possible time the airport operations managed in the already existing 1 Terminal. .
Comfort level of the new terminal complies with the«C» standart,
Unfortunately, the new Terminal 2 is plagued by mosquitoes, so do be prepared to deal with them if you're traveling through there at night.
Generally speaking, Shuangliu Airport to my first impression is like a train station, but was being built next to the new terminal building, presumably after the completion of the first-class.
Open the new terminal and execute the django command below to start the test server. and then, when you see the administrator page, you can see the data stored well in the screen below.
The new terminal, which is expected to be completed by October 2022, will be able to accommodate MSC Cruises' next-generation, still under construction MSC World Class cruise ships carrying up to 7,000 guests.
If the new terminal ran at full capacity and dedicated itself to transhipping containers to India, that could rise to 28%, leaving the country dependent on a foreign-run choke point.
On the inside, the new terminal features 55 check-in counters, eight jet bridges and eight standard gates, plus 16 moving staircases and 28 elevators.
On January 21, the decision was approved to withdraw Ukrainian soldiers from the new terminal which was completely destroyed and unsuitable for defense.
The new terminal will have an annual handling capacity of approximately 1.5 million twenty-foot equivalent units("TEU"s) of containers, an overall berth length of 850 metres, and a 16-metre draft upon completion, allowing the terminal to accommodate the advanced mega container vessels plying the oceans today.
We get off in the new South Gate, South Gate went to the new terminal luck, because if on the 20th to go to Leshan, our travel plans are running, otherwise you back delay, the Chengdu-Leshan about 2 hours squeezed into the car 21, the tour does it mean that we have compromised myself!
The New Terminal 's.
This is the new terminal.
View of the New Terminal's site.
New car parking was opened in 2011 together with the new terminal.