Examples of using The estimate in English and their translations into Chinese
{-}
-
Political
-
Ecclesiastic
-
Programming
In comparison, the estimate of the last IPCC assessment report would correspond to a warming of only 4 degrees Celsius every decade.".
The estimate covers the cost of services for alterations, repairs, sewage system improvements and maintenance, hard surfacing and water supply system maintenance provided by private contractors.
In addition, the estimate is based on the time and minimum effort required to technically build an application.
In epidemiological studies, uncertainty and variability should be separated in dose quantification to account for their different effects on the estimate of risk.
The estimate is up 29% from 2017, but about 40% lower than the record high of almost $1,200 billion in 2012.
The estimate is calculated on the basis of the rather low export figures recorded during the first half of 2013.[79].
The estimate provides for the phased repatriation of 148 military observers, and 2,731 military contingent personnel and the emplacement of 57 civilian police observers.
The estimate of future benefits system was enhanced to be accessible to all participants including those who have not yet received their annual statements.
In a European study of lung cancer risk due to indoor radon exposure, making such an adjustment doubled the estimate of risk.
The estimate reflects an increase of $0.012 per litre in the cost of aviation fuel from $0.188 in the prior period.
The estimate should also take into account the need for lecturers, seminars, laboratories, designing of training modules, etc.
The estimate is based on the average for other offices within the Department of Management;
But it also requires a fourth argument, which is the value of$x$ at which the estimate will be made.
Included in the estimate under other staff costs is the share of the Organization in the cost of lump-sum provisions under general temporary assistance and overtime.
The estimate reflects the application of a 20 per cent delayed recruitment factor against the proposed total staffing level.
The estimate is also based on the 2002/03 standard cost rates for New York in accordance with the latest salary scale.
The estimate provides for 4.5 litres of water per person per day for military contingent personnel at a cost of $1.15.
At present, there is no simple, direct way of measuring VLDL-cholesterol, so the estimate calculated from triglyceride is used in most settings.