Examples of using Pilot tests in English and their translations into German
{-}
-
Colloquial
-
Official
-
Ecclesiastic
-
Medicine
-
Financial
-
Ecclesiastic
-
Political
-
Computer
-
Programming
-
Official/political
-
Political
In addition to the implementation and pilot tests of value-added services,
The pilot tests for the elimination of microplastics were successfully carried out in 2017 in the EW Landau sewage treatment plant.
This will lead to the development of the test and pilot tests, to be carried out in the spring of 2008.
The evaporator size as well as the procedural design can be determined by laboratory- and pilot tests at the VTA test centre.
The Member States should carry out pilot tests of eCall in the 2007-2008 timeframe,
On the basis of the experiences from the pilot tests, full tests should be developed and run in the
So far, pilot tests have been carried out that measure what impact the EU budget has on how the priorities and quantified objectives of Europe 2020 are met.
Direct entry into pilot tests.
Pilot tests min. 40 VET/ 20 university participants.
The pilot tests on site demonstrated to us the superiority of the extraction technology.
There are various reasons for using laboratory and pilot tests to evaluate a separation process.
develops, pilot tests and optimises technical processes from life science industries.
Pilot tests in our test centers can also be used to provide additional data, especially for customer-specific components.
energy reduction of this method laboratory and pilot tests were carried out at Eawag.
The plant provides an ideal infrastructure for pilot tests to optimize membrane bioreactors
Pilot tests on a semi-technical scale have shown that the addition of AlCl3-based precipitants is an efficient method of combating floating sludge.
From process layout, pilot tests, engineering, mechanical design,
During pilot tests of these procedures it became clear that auditory cues could not be used to signal the initiation
data from data banks, and pilot tests.
In most of the cases, however, pilot tests should be performed to verify that the system is behaving as the liquid-liquid equilibrium data have predicted.