Examples of using Partial discharge in English and their translations into Hungarian
{-}
-
Colloquial
-
Official
-
Medicine
-
Ecclesiastic
-
Financial
-
Programming
-
Official/political
-
Computer
That is, the conventional test method cannot detect the partial discharge occurring in the insulation.
When the partial discharge of the transformer exceeds the standard and technical conditions, the cause of the partial discharge is analyzed
when the partial discharge to a certain extent,
The ultrasonic method measures the size and position of the partial discharge by detecting the ultrasonic signal generated by the partial discharge of the transformer.
According to the different insulation medium, the partial discharge can be divided into partial discharge of bubbles and partial discharge of oil;
However, due to the complexity of the transformer structure and heat transfer process, it is very difficult to directly detect the partial discharge located inside the transformer body by using the infrared imaging method.
Overhead Cable should carry out partial discharge test, its discharging power should not be less than 20PC.
The slight partial discharge has less influence on the insulation of the power equipment,
The factors that cause partial discharge detection to not proceed normally are diverse
Damage of the cable due to partial discharge of the air gap under the working voltage,
The measurement circuit using the RIV meter to detect the partial discharge is similar to the measurement circuit of the pulse current direct measurement method.
Verify that the partial discharge capacity of the transformer meets the standard and technical requirements at the test voltage
the high electric field may cause partial discharge, and gas-containing oil.
UHF partial discharge measurement.
the insulation structure does not allow a strong partial discharge occurs.
diagnose rapidly the partial discharge status, combined with real-time displayed images and data.
High current resistance measurement Partial discharge and dielectric loss inspection on high voltage cable grids using OWTS HV 150 equipment(uniquely in Hungary,
there may be internal arc or partial discharge failure, and should be combined with other tests to investigate the cause
by examining the partial discharge conditions of the device to analyze the insulating state of the transformer.
internal partial discharge capacity is reduced to the lowest,