Examples of using An interim evaluation in English and their translations into Slovak
{-}
-
Official
-
Colloquial
-
Medicine
-
Financial
-
Ecclesiastic
-
Official/political
-
Computer
-
Programming
The Commission should conduct an interim evaluation assessing in particular the quality
Cyprus proposes an interim evaluation of all existing State aid schemes by the implementing authorities
In addition to regularly monitoring the Programme, the Commission shall establish an interim evaluation report and shall submit it to the European Parliament,
The Commission should conduct an interim evaluation, assessing the quality
Furthermore, an interim evaluation report on the achievement of the Programme's objectives, the efficiency of the use of resources
the Commission shall conduct an interim evaluation of the FCH Joint Undertaking with the assistance of independent experts.
The Commission should conduct an interim evaluation, assessing the quality
(eeee) an interim evaluation report on the results achieved
the Commission shall conduct an interim evaluation of the IMI Joint Undertaking with the assistance of independent experts.
Not later than 2010 the Commission shall carry out, with the assistance of external experts, an interim evaluation of FP7 and its specific programmes on the quality of the research activities underway and progress towards the objectives set.
the Commission presented an interim evaluation report to the European Parliament, the Council, the Economic and Social Committee and the Committee of the Regions3 in 2004.
April 2011) and an interim evaluation of the CIP(March 2010).
At the time of our audit, the Commission had already prepared the terms of reference for an interim evaluation of the current guarantee instruments,
Under DG MARE framework contract for"Studies linked to the implementation of the EFF" studies the Commission committed EUR 346 515 for a study on an interim evaluation of the EFF(2007-2013) in order to prepare of the future funding instrument.
(27) The Commission should conduct an interim evaluation, assessing the quality
which requires an interim evaluation of the programme to be carried out.
regulations without carrying out an interim evaluation, share the responsibility for the most recent accidents.
(zz) an interim evaluation report on the results obtained
Not later than 2010, the Commission shall carry out, with the assistance of external experts, an interim evaluation of this Framework Programme
An Interim Evaluation was undertaken in 2003 i.e. at about the mid-point of the programme, but this was too early to