Examples of using The formwork in English and their translations into Danish
{-}
-
Colloquial
-
Official
-
Medicine
-
Financial
-
Ecclesiastic
-
Official/political
-
Computer
Fill the formwork with concrete to the top with the device of expansion joints with a step of 2.5 m.
Important: during the formwork assembly check the level of level
This should be done to prevent pipe collapse when the formwork is filled with concrete.
Set the formwork and pour concrete floor cement M300
designed specifically for the formwork.
Make the formwork for the floor, install reinforcing frame
gravel in the formwork with reinforced bars or mesh.
scoop to fill the formwork solution and well compacted bar.
set the formwork panels around the perimeter of the house
Additional 20-30 cm on each side are required to install the formwork and construction of protective drainage backfill.
Do not forget to provide the formwork equipment location,
After removing the formwork, the void is filled with sand
Betonbau GmbH& Co. KG in Bockenem is modernizing the formwork systems in their own precast factory with the help of Wacker Neuson.
If you decide to make concrete, while preparing the formwork for walls and poured concrete.
which is tied to the bars at the level of the formwork walls.
Important: remove the formwork structure should be approximately 2-3 weeks after the concrete is poured, and even better to
Carpentry tools for the construction of the formwork;
Carpentry tools for the construction of the formwork;