Examples of using Acceptance testing in English and their translations into Russian
{-}
-
Official
-
Colloquial
After acceptance testing for 48 hours under load was passed successfully, the unit was hooked up.
When the product is on its acceptance testing stage or on production stage- the price for bug detection and elimination would be biting.
End lot acceptance testing should be conducted through live-fire testing of lot samples over a range of conditions.
the Board emphasized the importance of user departments identifying persons who would participate in user requirements specification and acceptance testing.
Within the IMIS project team it is necessary to set up an acceptance testing unit, which could be aligned with the quality assurance function.
defects reports, and acceptance testing reports.
After acceptance testing the customer will be provided with technical support according to the agreed support schedule.
It should be noted that'because conditions during acceptance testing are generally favourable,
extruding or acceptance testing of solid propellants or propellant constituents specified
Periodic testing is arranged for 5 per cent of the signs from the batch which have undergone acceptance testing, with a minimum of two, not less than once every three years, to ascertain compliance with the requirements set out in the present standard.
sent to Kharkiv on March 16 for acceptance testing, followed by Unit -001 on March 17.
generating sales reports, and conducting acceptance testing for improvements under the project.
quality controls, acceptance testing and commissioning procedures necessary for the various stages of the project.
the integration of a new"other vehicle" column in the table(Marginal 220 500) will lead to questions on acceptance testing for type approval of these"other vehicles.
procedures(48 work-months), acceptance testing(57 work-months)
test-driven development and acceptance testing.
installation and conduct acceptance testing, as well as service
ensure that the user acceptance testing process is properly documented
quality controls, acceptance testing and commissioning procedures necessary for the various stages of the project.
it is important that the relevant user departments are also geared up to participate in the user requirements specification and acceptance testing to avoid slippage in the schedule.