Voorbeelden van het gebruik van Nras should in het Engels en hun vertalingen in het Nederlands
{-}
-
Colloquial
-
Official
-
Ecclesiastic
-
Medicine
-
Financial
-
Computer
-
Ecclesiastic
-
Official/political
-
Programming
NRAs should be closely involved in the development of SLAs,
NRAs should value all assets constituting the RAB of the modelled network on the basis of replacement costs,
In particular, NRAs should avoid(i) delays between the notification of draft measures and the adoption of final measures,
End-users across the EU should enjoy all of the rights conferred to them in the Directive, and NRAs should be fully empowered to enforce those rights;
Specifically, NRAs should set the RAB for this type of assets at the regulatory accounting value net of the accumulated depreciation at the time of calculation,
For this purpose, the NRAs should estimate the cost difference between an access product based on for example FttC/FttH
When determining the access prices of services that are entirely based on copper, NRAs should adjust the cost calculated for the modeled NGA network to reflect the different features of wholesale access services that are based entirely on copper.
If the enforcement of a proposed remedy requires additional time(e.g. because an appropriate cost model is still to be developed), NRAs should already provide in the notified draft measure for temporary remedies addressing the competition failure identified.13.
When modelling an NGA network, NRAs should include any existing civil engineering assets that are generally also capable of hosting an NGA network as well as civil engineering assets that will have to be newly constructed to host an NGA network.
In this regard, NRAs should examine all relevant characteristics particular to each designated undertaking,
NRAs should assess the most relevant retail products including broadband services(‘flagship products')
NRAs should ensure adequate accounting transparency of pricing schemes for access provided by incumbent operators, in order to avoid undue cross-subsidisation
NRAs should ensure that the margin between the retail price of the SMP operator
NRAs should identify flagship products on the basis of their current
When deciding on the appropriate efficient scale of the modelled operator, NRAs should take into account the principles for defining the appropriate efficient scale in fixed
When regulating wholesale termination charges, NRAs should neither preclude
When setting the economic life time of the assets in a modelled FttC network NRAs should take into account the expected technological and network developments of the different network components.
in particular in a second round market analysis, NRAs should first analyse and try to enhance
densely populated areas) NRAs should vary the test based on specific inputs identified as the most relevant.
When applying the method for asset valuation set out in point 34, NRAs should lock-in the RAB corresponding to the reusable legacy civil engineering assets