Primjeri korištenja First layer na Engleski i njihovi prijevodi na Hrvatskom
{-}
-
Colloquial
-
Ecclesiastic
-
Computer
The first layer is applied in a thickness of 2 to 4 cm without grouting, leaving rough irregularities on the surface.
After drying the first layer we put a second,
On the grid after curing the first layer of concrete applied to the second layer of concrete,
After curing the first layer may be applied to a second thickness up to 1 cm after the second grabs layer can begin to equalize the solution was poverhnosti.
Next, on the first layer of boards, again across,
The first layer- vinyl insulation,
After applying the first layer, a good product is dried
while it is on the first layer star topology.
First layer on a partition or a wall,
After the application of the first layer, the tree is likely to become"ruffled"
The first layer should not be done perfectly smooth,
After applying the first layer of the roller, wait for the necessary time for it to dry completely,
reduce the first layer to move flatly and the sharp part in first layer to change.
irregularities which have arisen after the first layer.
And to gravel after the rain has not sunk in the ground, the first layer of crushed stone can be mixed with cement.
it might actually come from moisture that is trapped and seeping from the first layer.
it has already gained half its length, now the first layer of fat will start to form.
it is recommended after laying the first layer of insulation and sealing,
it is possible to combine the first and third. The first layer of whitewash paint brush,
then poured the first layer of concrete in the 5-15 cm mesh reinforcement is placed after.