Related outputs and work packages include joint or shared information materials on key DLDD issues that have relevance for resource mobilization.
Related outputs and work packages include the development of innovative approaches for marketing DLDD/SLM issues.
In lean-optimized projects, a‘trades train' handles work packages of equal sizes in takt time.
Is contained in this document. It provides information on the outputs and main" work packages"/output items under the expected accomplishments of the GM.
In order to achieve these outputs, all programmes prepared costed work packages.
Both sides have been pushing ahead with the development of their respective aircraft structure work packages.
Both sides have been pushing ahead with the development of their respective aircraft structure work packages.
In such cases, the workplan document refers to" work packages" as a common nominator for activities or group of activities that will be carried out for the production of the outputs.
In addition, the work programme presents output items or" work packages" that elaborate the outputs, indicating the nature and scope of activities to be carried out by the GM.
Related outputs and work packages include information products, support to 25 countries per year, subregional workshops and participation in a GEF funded global programme to support NAP alignment.
(i) To map and connect with non-traditional partners(in sectors such as health, education): Develop value propositions and appropriate work packages for these new sectors;
Concrete steps to be taken in the near future towards achieving the workplans have also been specified as main outputs or work packages that are planned to be delivered in 2012- 2013.
It should be noted that the GM and the secretariat have also developed a Joint Work Programme(JWP) for the period 2012- 2013, the work packages of which are contained in document ICCD/CRIC(10)/4.
The lowest level of WBS is called a work package.
The lowest level of the WBS is known as the work package level.
The lowest level of WBS is called a work package.
This work package is part of the MiPS study DK, and will establish five main purposes in children and adolescents aged 3 to 15 years.
One work package seeks to promote the transition to community-based, socially inclusive mental health approaches targeting severe mental disorders.
The cost and accuracy of bottom-up cost estimating are typically influenced by the size and complexity of the individual activity or work package.
He was a co-investigator and Evaluation Work Package Co-leader on an EC funded Integrated Project,“MATURE: Continuous social learning in knowledge networks”.