Examples of using Impact analysis in English and their translations into Indonesian
{-}
-
Colloquial
-
Ecclesiastic
-
Computer
-
Ecclesiastic
Keraf has also said there are irregularities with Freeport's environmental impact analysis which need to be addressed.
The result of environmental impact analysis for the building that makes a significant impact to the environment.
The impact analysis should consider the change
CEO voice surveys, industry impact analysis and market observations.
port development, and environmental impact analysis(AMDAL).
Our system administration team documents the impact analysis of various software upgrades
Business Impact Analysis(BIA) is the activity performed by ITSCM,
Social Impact Analysis- social impacts are measured through a system of surveys
Engineering geology studies may be performed during the planning, environmental impact analysis, civil or structural engineering design,
performing impact analysis for the requested changes,
This summary report is intended for reading in conjunction with a full case study report- Good Practices of Environmental Impact Analysis- presenting examples of AMDAL good practice drawn from five regions in Indonesia.
enabling business impact analysis, bringing deeper insights to traditional sensor data analysis. .
Quality of Impact Analysis The Bangkala power project AMDAL in South Sulawesi(CS 5) provides one of best examples of impact analysis, good practice being attributed largely to the level of engagement of the Tim Teknis as well as the experience and quality of the AMDAL consultant.
environmental risk and impact analysis, environmentally friendly manufacturing technology
stress testing, and market impact analysis would benefit from the new AI tools.
provides preparation of feasibility study services including Survey and Investigation, also Environmental Impact Analysis in the areas of transportation,
allow you to conduct impact analysis of capability reduction,
system has evolved over time and how this might impact analysis(Harper and Konstan 2015).
The public rejection grew more intense following the release of a document containing an announcement on the environment impact analysis of the utilization of the land on November 4, 2019 by the BOP-LBF.
This means that, in addition to complying with environmental permits and Environmental Impact Analysis(AMDAL), the company has also made efforts to save water and energy use,