Examples of using Bulkhead in English and their translations into Japanese
{-}
-
Colloquial
-
Ecclesiastic
-
Computer
-
Programming
The N to N adapters category includes bulkhead, 4 hole panel or mountless configurations and 50 Ohm or 75 Ohm impedance.
Transportation: car ceiling, auto Industry Muffler, heat shields of exhaust pipe and catalytic converter, the ship bulkhead, highway fence.
Projects both in China and aboard, Our main products are LED bulkhead light, Surface mounted led ceiling light.
However, the United States government, which controls the bulkhead line, refused to allow longer piers to be built.
Used for high load parts and components, such as Skeleton parts, skins, bulkhead, wing ribs, wing beams.
B717 bulkhead seats in row 4 are equipped with airbag seatbelts.
LED Wall lamp 20W IP65 impact resistance bulkhead light 3 Year Warranty Features of Led Wall lamp 1.
Loves defeating the Decepticon's with his sword and is at peace when he spends time with his old friend, Bulkhead.
Bulkhead cutouts allow for removal of transceiver through the bulkhead(no need to open RRH for transceiver replacement).
(In Bulkhead Cleaner) is the first dry cloth fiber optic cleaner.
Bulkhead cutout allows for removal of transceiver through the bulkhead(no need to open PRH for transceiver replacement).
A waterproof, dustproof, corrosion resistant design, using metal die-casting bulkhead.
Bulkhead mounted housings, With thermo-plastic cover, Size: 16 B.
Designed for rapid connection to external flush-mounted bulkhead adapters on terminals or closures.
LC LC-UPC bulkhead tip, 1.25 mm UPC ferrule tip, 1.25 mm cleaning.
For water transport: any vessel or cargo compartment bulkhead or a fenced area on the deck of the ship, including any vehicle on board; and.
The N to BNC adapters category includes bulkhead, 4 hole panel Excellent technical support and customer service are on hand to assist our customers.
As a result, leaving no time to export a Hsieh, leaving a seat, he disappeared, and only then quietly leaning on a bulkhead of the backpack, but also a reminder of the concern.
With the Waterway"closed"(the Corps' word) bulkhead work will start at Dresden Island and Brandon Road, requiring 14-day closures and 90-plus day partial closures; dates are not yet set.
Bulkhead Lights.
