Examples of using Initial estimate in English and their translations into Arabic
{-}
-
Colloquial
-
Political
-
Ecclesiastic
-
Ecclesiastic
-
Computer
The National Elections Commission lowered the initial estimate of 8.5 million eligible voters, which was based on the 1980 census and was considered inaccurate.
The initial estimate of 800 person/months was calculated on the estimated work/months needed to accomplish certain tasks.
common staff costs are therefore higher than the initial estimate.
A construction contract was signed on 3 April 2009 for a total contract sum of $17.4 million, or approximately $230,000 more than the initial estimate.
In financial terms, the current estimate of net requirements of the mission is $3,566,700 less than the initial estimate of $16,291,800.
The Advisory Committee notes from table XI.1 of document A/AC.96/916 that the initial estimate of $49.3 million for global operations include $3.1 million for resettlement projects and $0.5 for voluntary repatriation.
The 1995 revised budget is slightly higher than the initial estimate mainly due to the creation of two Professional posts and one General Service post in the Supply and Transport Section to improve logistics and purchasing support.
With regard to the preliminary design phase, the Advisory Committee recalls that the initial estimate of the Secretary-General ranged between $12.3 million and $17.3 million(see A/62/512/Add.5, paras. 140-142).
It is projected that technical cooperation activities will amount to $121.4 million during the 2008-2009 biennium, an increase of $54.3 million, or 81 per cent as compared to the initial estimate of $67.1 million for the 2006-2007 period.
He noted with regret the growth in the budget for Umoja, now projected at $360 million through December 2015, compared with an initial estimate of $248.3 million.
as compared to the initial estimate calculated from the 2011 conceptual architectural and engineering study. The variance in cost has been calculated by taking into consideration the project constraints, risks, industry standards and best practice.
Initial estimate.
Initial estimate(A/65/560).
This compares with the initial estimate of $885,300.
There were 680 kilometers, more than the initial estimate.
The 1994 revised budget is similar to the initial estimate.
The initial estimate was for the production of 26 million barrels of oil.
This compared to an initial estimate of $600,000 in the September 1997 implementation plan.
In its initial estimate the USGS said there was a low likelihood of casualties and damage.