Examples of using Risk-based in English and their translations into Polish
{-}
-
Official
-
Colloquial
-
Medicine
-
Ecclesiastic
-
Ecclesiastic
-
Financial
-
Official/political
-
Programming
-
Computer
Risk-based approach: the rules will avoid a burdensome one-size-fits-all obligation and rather tailor them to the respective risks.
Risk-based approach, which can moderate the obligations of a data controller depending on the actual risk to data protection presented by the data controller's operations.
The JTPF therefore agrees to evaluate after a certain period of time the experience from applying risk-based approaches.
In the EU, standardisation inspections of the Member States by the Agency are following a risk-based approach.
ERM can also be described as a risk-based approach to managing an enterprise,
There may be need to consider reflections on a more comprehensive risk-based approach to investor protection.
Analyze and plan the optimal frequency of inspections according to the Risk-based Inspections(RBI) method based on.
amongst other things, that Member States review their controls to ensure they are risk-based and well-targeted.
A risk-based approach enables a more targeted
In support of a risk-based approach to auditing, a more structured dialogue between the Court of Auditors, the Commission and Member States is necessary.
Consideration could be given to incorporating the following elements of the risk-based approach in the forthcoming revision of the Directive.
cost-effective and risk-based monitoring and control mechanisms should ensure proper mitigation of the risk of fraud.
One feature of current risk-based minimum capital requirements is that they vary over the economic cycle.
In 2010, the Commission will adopt a legislative proposal to deliver a better risk-based approach to border inspections and to better target illegal trade.
It must also help to bridge the equity gap in terms of early stage risk-based financing.
Clarifying that a risk-based approach should be applied to PEPs even beyond one year after they have left office;
This would be done by the Board, with the assistance of participating DGSs, and on the basis of a set of risk-based methods established by a Commission delegated act.
notably by means of a differentiated, risk-based approach.
is needed to properly perform risk-based inspections.
It must be absolutely clear that taking a risk-based approach is not a soft option.