Examples of using Flight tests in English and their translations into French
{-}
-
Official
-
Colloquial
he was not present during the ground-runs and flight tests.
install an instrumentation system on-board the aircraft and complete flight tests of the land plane and seaplane variants.
Night Teaching Endorsement are granted on successful completion of two flight tests.
Bombardier announced today that, based on flight tests results, its all-new CS100
The flight tests indicated that the Su-6 was superior to the Ilyushin Il-2 in nearly all performance categories,
The standards for helicopter flight tests call for entry at a safe height
One aviation author wrote of the crash,"The flight tests showed conclusively that, at take-off configuration, a DC-6 becomes uncontrollable with
Originally fitted with a conventional tail, flight tests suggested stability would be improved by mounting the stabiliser higher, similar to a T-tail, which was implemented on the second prototype.
Aeronautical Testing Service Inc. 17 conducted flight tests on an unmodified DHC-2 aircraft as part of the vortex generator design process for that aircraft type.
any required familiarization or check-out flight and the two National Finals flight tests courtesy of Airline Pilot's Association(ALPA);
Since the Cessna 208 aircraft was originally certified, flight tests of several series of Cessna 208 aircraft have been undertaken to assess performance in icing conditions.
where he wrote his thesis while conducting flight tests for the army.
The FM station shall be tested at the authorized parameters and pass the monitoring and/or flight tests conducted by ISED
30 degrees of pitch were reported as being common during these flight tests.
During some 20 flight tests conducted by Iraq, the modified SA-2 missile achieved a maximum range of up to 270 km,
Flight tests of the second example pre-production aircraft, conducted May-October 1937, revealed that it was slightly inferior to the TsKB-30 in performance, but still exceeded its
However, this proved to be in vain because the manufacturer's flight tests were not concluded until 30 July 1947 as the turbo-superchargers were not delivered in a timely manner.
During flight tests, the DH 108 gained a reputation for being accident-prone
Later it was fitted with a towing shackle and used for flight tests of the heavy Ilyushin Il-32 glider,
In flight tests, the G. 38 set four world records including speed,