After 7 days remove the formwork- the foundation is ready.
Prepare the formwork for the floor and pour concrete. Important!
Construction strength and robustness are dependant to a high extent on the formwork quality.
you can install the formwork.
After the completion of works on the foundation base dismantle the formwork.
Withstand rows jumper on the formwork, depending on air temperature from 12 to 24 days.
When the formwork is ready,
designed specifically for the formwork.
After the concrete has solidified, the formwork is carefully disassembled,
This can be a concrete strip created by casting into the formwork with or without reinforcement, or it may be a solid reinforced concrete slab connecting pillars or piles.
Then the formwork is inflated to the design pressure calculated at the design stage,
gravel in the formwork with reinforced bars or mesh.
Then the formwork is built from the board
Instead of preparing the formwork for lintels or tie beams,
The formwork is poured with concrete,
Plywood for the formwork produced in Finland can withstand 100
If the formwork material absorbs water well,