Examples of using Validation tests in English and their translations into French
{-}
-
Official
-
Colloquial
manufacture of prototypes and technology validation tests were carried out in 2006.
Within this team he was involved in the development of the prototype, validation tests and finalizing the industrial software(InterWellTM), with validation on several field cases.
GRRF agreed on making validation tests to confirm the idea of the proposal
A full programme of system validation tests is now underway in which the quadrupole circuit will be powered up
Validation tests on infant formulas carried out on the INRA pilot drying tower revealed that the deposit rate of the powder in the chamber is inversely correlated with the dry glass transition temperature of the concentrate
a campaign of cryogenic validation tests took place in spring, 2006,
this approach allows to perform validation tests with a provisional vehicle classification and take into account
It is established from the technical elements collected during the design and validation tests carried out during the deve- lopment of these road safety systems and function of the state of the art,
prototyping, validation tests, pre-production debugging, production, after-sales.
He pointed out GRPE's decision to stress the finalization of the test cycle and its validation tests, as well as the group's intention to start the Round-Robin Test Programme in October 2003, according to the initial timetable.
manufacturing of prototypes and pre-series, to validation tests and process design,
the evaluation of the Step 2 programme was still in progress within the WHDC working group(chaired by Mr. C. Havenith- Netherlands) and that the validation tests were delayed due to budgetary problems.
Validation test, September 28- October 2, 2009.
Validation test and refine, etc.
Validation test for common test cycle,
Spacecraft Operations Validation Test SOVT.
A more detailed analysis of the validation test results can be summarised as follows.
The validation test phase would be made during the 2003- 2005 period and a draft gtr may be available after 2005.
It was decided to postpone a final decision till the analysis of the emissions validation test results will have been finished.
This test, called SSVT(Satellite System Validation Test) proceeded from the 5 to March 7 under CNES management.