Приклади вживання The critical path Англійська мовою та їх переклад на Українською
{-}
-
Colloquial
-
Ecclesiastic
-
Computer
In other words, individual tasks on the critical path prior to the constraint might be able to be delayed without elongating the critical path; this is the'total float' of that task.
doing so leaves round-trip delays on the critical path.
Whereas activities that are off the critical path have float and are therefore not
Complex network diagrams, called PERT charts and the critical path method were introduced,
Complex network diagrams, called PERT charts and the critical path method were introduced,
As a result, an LOE activity should never be on the critical path of the project schedule, as it never of itself adds time to the project. Rather, manufacturing would be on the critical path, and the oiling activity would become shorter
H are off the critical path with floats of 15 days,
then the entire project will be delayed by one day(unless another task on the critical path can be accelerated by one day).
What is the critical path method.
Duration(length) of the critical path;
The path with longest duration is the critical path.
Which activities are part of the critical path?
Ideally, the length of any of the complete paths can become equal to the length of the critical path or at least the path of the critical zone.
not as part of the critical path.
Another study found that up to 35% of page load time in the critical path is spent on computation like HTML parsing and JavaScript execution on mobile devices.
Critical path.
Critical path.
Critical path.
View Critical Path.