Examples of using Initial construction in English and their translations into French
{-}
-
Official
-
Colloquial
Enables the assessment of future investment requirements by considering the total cost of an asset over its life expectancy rather than limiting decisions to initial construction costs.
The study utilized a model whereby the government funded approximately 85% of the project's initial construction costs and the private sector funded the remaining 15.
that private sector involvement is possible, provided that a large portion of the initial construction costs were to be financed by the government of Uganda.
many development environments that work in a sequence to push updates from initial construction, to code and content integration,
the lower parts remain from the initial construction, while the upper part dates from the 16th century always in Mudéjar style,
he explains that Living Bauhaus is carrying out initial construction for both its own building
The initial construction and any major renovation
As in everything preserved of the initial construction in the other two churches; the kind of bond is very regular, based on small
equipment condition assessments and measurements were undertaken at the time of initial construction.
reinvestment for asset renewal of the facility, both during the initial construction and commissioning phase,
which was built alter initial construction and used for a summer kitchen
our client has informed us that he must add a concrete wall that extends beyond the wall between his neighbour and him, even though the initial construction met the standards set out just 15 years ago.
These impacts apply directly to the owner of the house or building in terms of energy cost savings(and higher initial construction cost) and also to the broader society in terms of energy security
The initial construction costs would imply a certain annual opportunity cost of finance(debt service or other public service
A building's initial construction costs typically represent only 20 to 30% of the building's entire costs over its useful life,
A building's initial construction costs typically may represent only 20 to 30 percent of the building's entire costs over its useful life,
entire life cycle and thus selects a cost-effective solution in terms of both the initial construction costs and the potential energy
that may have gone through modifications since its initial construction, consists of four vaults,
including the initial construction activity and the prepositioning of a Border Mechanism advance team, essential local staff,
with the added value that it forms part of an homogeneous ensemble with regard to an integral planification and an initial construction type, utilizing the same bond,