Examples of using Existing building in English and their translations into Romanian
{-}
-
Official
-
Colloquial
-
Medicine
-
Ecclesiastic
-
Ecclesiastic
-
Computer
-
Programming
Rehabilitation and structural consolidation of an existing building may be an option to consider.
Started from an existing building, we have news of purchases of black and white marbles for its construction only starting from 1227.
(15) The rate of building renovation needs to be increased, as the existing building stock represents the single biggest potential sector for energy savings.
The new project was erected next to the existing building with the assumption that both facilities are included in the complex logistics processes of production and distribution.
He is currently overseeing a LEED certification of an existing building in Portland Trust's portfolio that recent was sold for 100 million Euros.
Work has been completed in August for the reconstruction of the existing building and the extension of the new depadance at Hotel Berulia in Brela.
The Astron roof system was built over an existing building to match the appearance of the LPA900 wall panels selected for the new facility.
The project entailed consolidating and modernising the existing building, which included ventilated and curtain façades.
can be connected to an existing building with a connecting tunnel.
notably by renovating the existing building stock.
easiest ways to create a new foundation for an existing building.
executed by suprainaltarea of an attic over an existing building. First-class finishings.
Obstacles to the renovating of the existing building stock based on a split of incentives between the different concerned actors should also be tackled at national level.
the ridge at the same height in order not to interfere with the existing building architecture.
Combining your existing building size and your automation requirement of the process,
That is why the Member States must immediately launch a programme of deep renovations in the existing building stock to achieve a nearly zero level energy consumption in the built environment by 2050.
We opted for a methodology of intervention that involves the rehabilitation of the existing building to the east, keeping the materials
Deviate from existing building standards and allow Balticgruppen AB to build 40 per cent fewer parking spaces for cars in their new development;
relevant Romanian ministries, BPIE mapped out the existing building stock, promoted best practices relevant to financing schemes
Existing building owners, operators,